Showing posts with label non-Christmas cardigan. Show all posts
Showing posts with label non-Christmas cardigan. Show all posts

Sunday, May 4, 2008

Declare Victory and Move On

So there I was, knitting the button band, when I started to feel a little apprehensive... 'this button band sure is taking a lot of yarn' I thought. And 'isn't it a good thing that I saved the bit left from the sleeve instead of knitting it onto the body the way I'd planned?' I finished the skein, joined on the bit left from the sleeve. I kept knitting.

And then, four inches short of the length of button band I needed? I ran out.

Now I did have a backup plan. This is a long sweater- swiping a couple of rows from the body wouldn't have any difference to the wearability of the sweater. But it sure would have been annoying to take out that whole hundreds-of-stitches cast off and re-do it. Fortunately, before I had time to get too worked up, I remembered something else. The Strategic National Yarn Reserve, savior of more than one of my prior projects- aka, The Swatch.
swatch saves the day

And I was saved! After that, it was finishing the sewing, weaving in a million ends, and sewing on buttons for the win!

Excuse me while I gloat for a few minutes:
sweater
sweater
sweater

This was how much yarn was left:
very small amt of yarn

And now for the project debrief:
I'd forgotten how long this particular button band needs to be, but also how smoothly and neatly it finishes the sweater- totally worth the trouble. The sweater isn't really as long and narrow as it appears, the knit columns broken up with purl rows tend to pull in like gigantic ribbing- which should not only accommodate the larger size of the recipient, but gently gloss over any slight mis-sizing.

I like the Berroco Love It yarn well enough. It was a pleasure to knit with- very flexible and easy on the hands. I'm a little concerned about how it will wear- it didn't take well at all to being pulled out and reknitted- the yarn looks a bit scuffed. Although it's supposed to be machine washable, I'm going to recommend that it be washed inside a mesh bag to prevent excessive rubbing or stretching. I'm still a bit worried about whether it will pill. Time will tell of course.

I'm very pleased with the pattern - the top down construction made it very easy for me to try it on and decide if I was going badly wrong or not. It does need a certain amount of interpolation on the part of the knitter- one does need to think about sleeve decreases (preferably more thoroughly than I did before knitting). I enjoyed being able to use whatever designs I wanted on it (though it does take more planning to do because of the need to add increase stitches in pattern as the yoke grows in size). At the same time, I may think twice about using it again for something this large. By the time I hit the halfway point, it was hard to carry with me, which slowed my progress considerably, since I tend to do most of my knitting while running around. It would be completely brilliant for kid's sweaters though.

Altogether a very enjoyable knit, and I learned a lot. But for my next sweater? I think I'm going to knit a pattern from my bookshelf, and enjoy having the design done for me. I've decided that I don't require this level of deep thought in every project I do!

Friday, May 2, 2008

A Whirlwind of Activity

I don't know where the month went, I truly don't. It was March, there was this blur (with a gloriously summery week in the middle) and then, poof!, it's May. May. I'm wondering if some scoundrel has made off with a week somewhere.

Last weekend I went out to WEBS to see Stephanie Pearl-McPhee (along with hundreds and hundreds of other people). Everyone and their mother has already blogged about this so I will say only a) Northampton was as lovely as ever, and had all her spring flowers out to welcome us, b) Stephanie was as funny and gracious as everyone says and c) sock yarn was on sale:
Photobucket

I consider that I was fairly restrained, though part of that was that I wasn't vicious enough to elbow and or trample other knitters to get to everything that I liked. The store was very busy and crowded when I got there- by the time I left for the theater, people were packed in elbow to elbow, and you could hardly see the yarn.

On the cardigan front- I knit on the way out to Northampton. I knit while chatting with my lovely and hospitable mother-in-law. I knit while waiting at the store, during the talk, on the drive back. I've knit all week since I got back. This damned sweater? Isn't done yet. (Okay, I'm on the button bands. But I'm not making any more predictions about how long this is going to take to finish. I'm out of the predicting business. It will be done when it's done. Didn't I say some weeks ago that I tend to overestimate my speed at getting things done? I wonder why I didn't listen to myself.)

So. It's a cold and rainy Friday. And that's a good thing, since my plans involve throwing in a DVD, drinking a cup of hot chocolate and knitting button bands. However, I did get just a little bit of sunshine- it came in the mail. Woats helped me open it:
Photobucket

I could tell you that she loves yarn, but that's a lie. She really wants to eat the tape on the package. (She wasn't allowed to. She's still sulking.)

So beautiful sunny Lola (in a colorway appropriately named A New Day), my prize from Karen's blogiversary contest, is hanging out with the other sock yarns. She doesn't have a plan yet, but I'm turning over a few ideas.

Photobucket

Wednesday, April 23, 2008

Confession Time

Okay, it must be said that I did not so much *miss* the deadline, as become distracted and wander blissfully off the path to project completion, smelling the flowers and feeling the warmth of the sun on my face. Somewhere off in the distance, there was a "whoosh", a sonic boom, and the fading wail of the whistle as the deadline went by.

In my defense, I can only say, it was 75 degrees. And sunny. And I did clean up much of the yard, and ride my bike, and still managed to get most of the sleeve done.
Photobucket

I realize that this is old news to the rest of the country, but Spring is Here! (It's different when you see it in your own yard.) Look! Forsythia.
forsythia

Wee rhubarb plants. (Aren't they cute?)
baby rhubarb

And a bud, yes, a bud on the daffodils.
daffodil in progress

But the prize for first flower of the season, beating even the forsythia?
overachieving dandelions

Even if I didn't actually kind of like dandelions? At least it's not a huge pile of snow.

And then today (to my utter disbelief), the temperatures soared into the 80s. The violets were quite confused but willing.
rather confused violets in bloom

I don't normally see violets until late May or early June. Heck, most of the violets in the yard are too young to date, let alone engage in flowering behavior. (Did all that rampant flowering sexuality distract you from the cardigan? Yes? Excellent!)

Happy Spring!

Thursday, April 17, 2008

Ignorance is Bliss

The first time I made buttonholes, it was about 2 am on Christmas morning. I'd brought all the completely knitted pieces down to my parents' with me Christmas Eve, and had planned to quickly sew up the cardigan and wrap it before going to bed that night. (Blocking? I'd never heard of blocking.) Since I wasn't admitting I was so late in getting it done, I kept up a normal conversation until I could retreat to the spare room and whip out my needle and yarn. I got it all sewed together (taking longer than I'd planned, but I'm a night owl, I can stay up late). And then I went to sew on the buttons. And realized there was something terribly wrong. Surely the front of the sweater wasn't supposed to look like this?

I quickly whipped out the pattern and carefully perused the photo. There was a trim piece- a button band- going up one side of the cardigan, around the neck and down the other. A careful reading of the pattern showed that I had missed knitting that piece- so shoot me, I'd never made a cardigan before. Fortunately I had all the materials with me. I had approximately six hours before presents were due to be ripped open, and The Plan said I was going to have a *completed* sweater, *neatly wrapped* and *under the tree Christmas morning*.

No one had ever told me that button bands were difficult, that making neat buttonholes could be tricky or that even experienced knitters sometimes fuss over them. I had a pattern, it instructed me how to make buttonholes, and so I just did it. I knit like the furies were waiting to eat me if I somehow failed to finish this sweater. I knit yards and yards and yards of that danged nine-stitch across button-band. And when it was done, I sewed it to the sweater, sewed on the buttons, carefully wrapped it, and slipped downstairs to place it under the tree. It was 5 am, and I yawned through the holiday, but the sweater was warmly received and looked perfectly fine notwithstanding the last minute panic.

It is this sort of thing I have been thinking about while knitting the very same design of button band for the current sweater.
Photobucket

I finally frogged the first sleeve and started reknitting it this evening.
Photobucket

I'm trying to use up pretty much all the yarn, so I am getting the button band started early. I'm figuring on getting the last sleeve done, then knitting half the button band ball onto the bottom (leaving some to finish knitting the band), then use the last full skein as ribbing. This is probably making life overly difficult, but the economy of using all the yarn was one of the things that made me choose this design to begin with. And I do love a Plan.

And speaking of Plans, that whooshy deadline noise is working up to a dull roar. I really want to have this sweater done for early next week. Like Monday, early next week. One sleeve and a bit of ribbing, that's not too much, is it?

Of course I can't actually blow off *everything* this weekend to knit. And my husband has started dropping delicate hints that maybe this is a Christmas cardigan after all- next Christmas. But I have a Plan, darnit. And I don't *know* that I can't knit a whole sleeve and a bit of ribbing and block this ready for Monday, the way the Plan says.

Ignorance is bliss.

Monday, March 31, 2008

Sock Love

So, last week, Alison suggested that if I was bored with the sweater, I should try something new. And I explained to her in email that I had done that- (two pairs of socks, a hat, two pairs of mitts and a bunch of stockinette blocks), and what it was inspiring me to do was more short fun projects. My plan was to knit through my road trip to Albany this past weekend and try to make serious progress, given that I've got a deadline starting to make that familiar whooshy noise up ahead for the cardigan.

And I did- my lovely spouse did all the driving, I knit through NH, Vermont and NY, I knit through much of the house party and I finished a whole sleeve.

But I underestimated Alison's superpowers of enabling, because somehow that ball of sock yarn also fell into my bag. (With the pattern and appropriately-sized needles. I'm telling you, she's good.)

Photobucket

Have I mentioned lately how much I adore socks? They tend to go fast, because I stick them in a ziplock and tuck them in my coat pocket when I go to a restaurant or the bank or the grocery store. Even standing in line becomes knitting time- I just pull the needles out and knit standing up, with the yarn still in the pocket.

And this yarn is lovely- look at the stripes, and the variegation. The dark stripe is really a very dark green, making these kind of foresty beige/tan/dark green socks. These are sedate enough not to raise eyebrows at the office (I'm already the weird one...it doesn't take much in my industry), and yet super-fun to knit. I'm mesmerized by the cute little chevron-angles of the strips. The pattern is very simple- two row repeat. I'm loving these socks.

Yeah. That Alison. Totally superpowers.

Sunday, March 9, 2008

A Maze of Twisty Cables, Twisting the Wrong Way

While I'm sure that any knitter who has knit cables has experienced the annoying discovery that something was mis-crossed or mis-counted many rows back, I feel that it takes real talent to reverse an entire repeat of a cable panel.

Clearly I have talent.
Photobucket
Do you see it? The top repeat twists are all opposite of the twists on the next one down.

Not being a masochist (I'm knitting this top-down, so I have the entire body of the sweater on one long circular at this point) I'm not going to tear out over 20 long, long rows to correct this. But due to the excessive thoroughness of the mistake, I did have to drop the entire panel.
Photobucket

And annoying as it was, I feel much better now. All my right hand cables twist neatly to the right, left hand cables obligingly twist left. Here are the two sides of the front, side by side for comparison.
Photobucket

And in other news, it is indeed cold enough today to justify hand-knit wool socks, and I'm wearing my new festival socks quite happily. (It has finally stopped raining, which also helps my mood.)

And I have started the second sleeve of the sweater, rather than frogging the first back to the shoulder- I'll have to do it later, but first I want to make sure I've finally got the decreases right on the other sleeve. This yarn does seem to get a little worn-looking with re-knitting, so I'd like to ensure that the next time I pull that sleeve out will be the last.

Okay, okay I'm really still dragging my feet because pulling out knitting is vexing. But I think my reasoning for doing it this way is still valid!

Friday, January 25, 2008

How Many Balls Does One Knitter Need?

Well, I still haven't mustered the willpower to rip back the sleeve, but I have a pretty good idea how much yarn it took- three balls, and when I re-knit it narrower it will be less. Here's what it looks like when the cat isn't making it self-conscious:
Photobucket

The body will take another four, and that's how many I'll need to buy this weekend. The back of the sweater:
Photobucket

And in other news, the cable cuff mitts have been warmly welcomed at their new home. May they keep typing fingers comfy for many moons.
Photobucket

Tomorrow will be a day filled with passenging (yay, knitting time!) and various other excitements. There shall be a full report (and quite possibly cool photos) on my return.

Wednesday, January 23, 2008

The Non-Christmas Cardigan, aka What Idiot Thought This One Up

Photobucket
(Having actually referred to the cat in my header, I thought it was time she put in an appearance- here's Woats, looking cute beside the vexatious cardigan in question.)

The Plan:
In October(!), having finished two pairs of socks and not having any other committed knitting on the horizon, I said "Gee, I've been having so much fun knitting Christmas stuff, I should do more- I know! I'll knit a sweater for Christmas!" So I enlisted spies to ascertain the desired color and obtain measurements, found a pattern and ordered yarn. [Name of recipient has been omitted to preserve plausible deniability should he stumble across this blog. Hint- if you think I might be knitting this for you? Stop reading now, please.]

Why I Might Not Have Been On Drugs When I Dreamed Up this Brilliant Plan:
1. I went on a trip to Hawai'i in November- where I was spending approximately 30 hours in airports or on planes- generally prime knitting time. My original plan said I would knit 30-50% of the sweater while on this trip.
2. I'm a moderately fast knitter. I've turned out baby blankets in about six weeks, which had roughly the surface area of a sweater, and were in a smaller gauge. I've been doing a pair of socks in two weeks- not as big, but they're in fine yarn with lots of stitches. The sweater is thick yarn plus large needles = fast knitting.
3. I chose a top-down sweater pattern to reduce finishing (inspired by the amazing posts of That Laurie), and so the size could be adjusted as I went (meaning that I should never get to the point of discovering the sweater will fit Tiny Tim or the Incredible Hulk, but not any living person of my acquaintance, never mind the recipient of the gift).
4. My database class last semester taught by a (quite good) professor- but he had the remarkable ability to talk for two hours without breathing, drinking water, or apparently noticing that his subject material would stupefy the most enthusiastic computer geek. Even he seemed less than enthralled. (There are topics that will keep me alert and interested for two hours of lecture- relational algebra, entity-relationship diagrams, and transactional concurrency are not them.) Knitting was a necessity. So why not whittle away at my Christmas list at the same time?

Why I Was Totally On Drugs When I Had This Stupid Idea:
1. Most of the flights were early AM. The ones that weren't were redeyes. I mostly slept on these flights. Additionally:
2. Though I had the yarn a week before the trip, the pre-vacation crunch meant that I only had time to swatch to determine what size needles I wanted to use and buy the needles. I had a generic pattern for a top down sweater with a raglan sleeve, but I hadn't yet chosen the patterns to go on it! (The original plan said that I would have patterns all chosen and on the trip I would Just Knit, but I ran out of time.) And while knitting is great for being able to pick it up for a few minutes here and there? Design is not. Many evenings I got in from sightseeing, glanced at the pattern, read half a page of a book instead and fell asleep.
3. I habitually underestimate the amount of work in a project and totally overestimate my own ability to cope, resulting in deadline crunches.

Why The Design Matters:
I'd have been much better off if I was doing a plain sweater. I'm not. [The recipient] loves cable-knits, and once owned a cabled cardigan* which he passionately loved and wore constantly until it fell apart. Several years ago, [my spy] mentioned that he'd really like another, but I was busy with a quilt, and deferred the request. Until now. So I wanted to knit the basic sweater pattern but with some modifications- make it a cardigan with a V-neck (like the old one) and with a new cabled pattern of my own devising.

Seems fairly simple, right? Wrong. It's the combination of the raglan sleeve and the damned cables. All the increases between neck and shoulder? Have to be done in pattern. That means I can't just add a stitch- it has to be the right one, to be part of the pattern that will be *below* it on the sweater (when it's longer). And it's not like I'm adapting a pattern I already had lying around (where I could have penciled in some additions). No, I'm picking a bunch of different cable designs I think will look good together, arranging them to suit myself (and the sweater) and trying to add *those*. Then, keep in mind, I love symmetry, and nearly always when knitting cables I'll try to make the left and right be mirror images. So in half the sweater I'm also flipping the instructions right to left to get the cables to mirror each other. Not surprisingly, this all turned out to be *way more* than I could do in my head. WAY MORE. So I spent most of the trip designing. Picking cables. Charting them in order and marking the increase lines so I could see what I needed to do for each set of increases. Making some minor changes to the pattern to help me keep track of what I was doing.
*Now that I think about it, the original cardigan was finished at 4 am Christmas morning. That was 15 years ago. Evidently, I have not learned anything.

Once the planning was done:

I only started knitting at the end of the last flight home (jetlagged, underslept, and all). I knew when I got back (mid-November) that I was basically screwed as far as the Christmas deadline. I still kept obsessively knitting until about the second week in December (I was totally in denial), but eventually I had to face the evil truth. So I put it aside (cursing mightily), and did other last-minute Christmas stuff.

At New Year's, I had part of the body and half a sleeve done, and a sinking feeling that I was running out of yarn. Also, the almost-completed sleeve? Was sized for the Incredible Hulk. So I ripped it back, and redid it. Two weeks later, the nearly-completed sleeve was sized merely for a body-builder with upper arms the size of a man's thighs. Rip, rip, rip. I put the sweater in its basket to think things over for a couple of weeks while knitting mitts and a hat. (Also, it's getting bulky enough to be less useful as travel knitting. Also I clearly needed a review of basic arithmatic.)

My mission this week? Reknit the damned sleeve and figure out just how much more yarn I need so I can get it this weekend at Webs.

Things I have learned from this experience:

1. Two pairs of socks ≠ a sweater.
2. A baby blanket ≠ a sweater. And even if the blanket and the sweater have the same number of stitches, the added complexity means the sweater will require more time. (This seems quite obvious. Now.)
3. Hofstadter's Law applies to knitting.
4. Hofstadter's law applies to knitting even when you take it into account.
5. No matter how carefully you calculate, if the project has a deadline, you will run out of yarn. Unless you seriously overbuy, and then you'll find you have enough to knit four sweaters (no, I am not kidding- here are two of them).