Today I got home and found a package waiting for me. And to my delight, it contained:
A new knitting bag, from Toni, inspiration and originator of last year's 100 project challenge. (This year, she's doing 111. I chickened out of that one.) I love the little embroidered balls of yarn.
It also had huckleberry coffee (which I haven't tried yet) and some lovely toffee. (Biscuit was fascinated with this--it was quite hard to get pictures of anything other than blurry cat heads. I finally had to lure him off the table so I could finish.)
The toffee is a Boise Idaho product and quite delicious. Jonathan thinks so too. It probably makes me a better person to share the toffee rather than hide it and eat it all myself, right? It is Valentine's Day after all.
And last but not least, an embroidered towel!
I'm a little unsure what to make of 'complex and fruity' but then we've already agreed that my sanity is a little questionable. Certainly it will look very stylish in my kitchen! (The color even matches my tile.)
Thanks, Toni, for a lovely surprise!
Showing posts with label 100 projects challenge. Show all posts
Showing posts with label 100 projects challenge. Show all posts
Monday, February 14, 2011
Friday, December 31, 2010
The Home Stretch
It's been a pretty busy year, trying to keep up with Toni and her crazy hundred projects goal. It's possible I should have remembered that I mostly knit, and knitting is a slow craft...but you're wondering if I made it or not, aren't you? Well, as of my last post, I had completed project 94. Here's project 95, another pair of mammoth woolly house socks:

And since I was flying through the bulky weight, I cast on right after that for a pair of heavy men's mittens:

But I was starting to run seriously short of time, and after carefully looking at all my WIPs, I concluded that none of them were close enough to done to finish without giving up on the hundred project goal. Since I've got just a teensy competitive streak, I abandoned them all with scarcely a second thought and started casting on small mittens just as fast as my little fingers would fly. That brings me to 97 and 98, a pair of 4-year-old mittens and a pair of infant mittens. I was particularly pleased when I realized that if I knit the infant mittens in the round, I could do a three-needle bind-off at end and not have any sewing at all!

Number 99 needs a bit of explanation. My sister Kate very kindly made new curtains for my husband's office and my sewing room for Christmas. Not knowing how we'd want them to hang, she included a bunch of coordinating ribbon to make curtain ties. I loved the lace curtains in the sewing room just as they were--see:

But my husband wanted his tied back- they're a very handsome blue, but thick enough to block a lot of the light. So I trekked over to Jo-ann's today for some rings for the ends, and then sewed ends and rings for the ties:

And then hung them all up. Cookie inspected them closely and has pronounced them good. (Actually he just sniffed them a lot, but it was an approving sniff.)

And last but not least...I couldn't possibly come so close and then miss by just one project! So despite having woven in ends on No. 97 this morning, and completely knit No. 98 and done the sewing for 99...well. What's one more pair of mittens?

(See, they're waving Happy New Year!)
So. Whew. That's a lot of craft projects. I couldn't resist crunching a few numbers. The breakdown by crafts:
Knitting: 90 (!)
Crochet: 4
Carpentry: 2
Sewing: 4
Types of projects:
Mittens: 40
Fingerless mitts: 7
Gloves: 1
Socks: 19
Sweaters: 6
Hats: 18
Headband: 1
Scarves: 1
Cowls: 1
None of these numbers especially surprise me except for the socks...I hadn't realized there were so many. And five pair were in worsted or bulkie weight yarn...but all the rest were fingering weight. I'm starting to see why the last four pairs I have in the queue didn't make it for the year.
I've had a lot of fun with this, and it's certainly true that having a goal has pushed me to do more. However I don't think I'll be doing it again in 2011. I have some non-craft projects that haven't really moved this year, in part because of the craft focus. And the goal pushes me to do more small projects--which would be fine, except that I have two sweaters in process and six more in queue that I'm anxious to knit. Which is not to say that if I find I'm still in the running at the end of the summer, I might not decide to play again. I do tend to have small portable projects on the needles even if I'm working on a sweater at home. But right now it's not looking very likely.
Happy New Year and happy crafting in 2011!

And since I was flying through the bulky weight, I cast on right after that for a pair of heavy men's mittens:

But I was starting to run seriously short of time, and after carefully looking at all my WIPs, I concluded that none of them were close enough to done to finish without giving up on the hundred project goal. Since I've got just a teensy competitive streak, I abandoned them all with scarcely a second thought and started casting on small mittens just as fast as my little fingers would fly. That brings me to 97 and 98, a pair of 4-year-old mittens and a pair of infant mittens. I was particularly pleased when I realized that if I knit the infant mittens in the round, I could do a three-needle bind-off at end and not have any sewing at all!

Number 99 needs a bit of explanation. My sister Kate very kindly made new curtains for my husband's office and my sewing room for Christmas. Not knowing how we'd want them to hang, she included a bunch of coordinating ribbon to make curtain ties. I loved the lace curtains in the sewing room just as they were--see:

But my husband wanted his tied back- they're a very handsome blue, but thick enough to block a lot of the light. So I trekked over to Jo-ann's today for some rings for the ends, and then sewed ends and rings for the ties:

And then hung them all up. Cookie inspected them closely and has pronounced them good. (Actually he just sniffed them a lot, but it was an approving sniff.)

And last but not least...I couldn't possibly come so close and then miss by just one project! So despite having woven in ends on No. 97 this morning, and completely knit No. 98 and done the sewing for 99...well. What's one more pair of mittens?

(See, they're waving Happy New Year!)
So. Whew. That's a lot of craft projects. I couldn't resist crunching a few numbers. The breakdown by crafts:
Knitting: 90 (!)
Crochet: 4
Carpentry: 2
Sewing: 4
Types of projects:
Mittens: 40
Fingerless mitts: 7
Gloves: 1
Socks: 19
Sweaters: 6
Hats: 18
Headband: 1
Scarves: 1
Cowls: 1
None of these numbers especially surprise me except for the socks...I hadn't realized there were so many. And five pair were in worsted or bulkie weight yarn...but all the rest were fingering weight. I'm starting to see why the last four pairs I have in the queue didn't make it for the year.
I've had a lot of fun with this, and it's certainly true that having a goal has pushed me to do more. However I don't think I'll be doing it again in 2011. I have some non-craft projects that haven't really moved this year, in part because of the craft focus. And the goal pushes me to do more small projects--which would be fine, except that I have two sweaters in process and six more in queue that I'm anxious to knit. Which is not to say that if I find I'm still in the running at the end of the summer, I might not decide to play again. I do tend to have small portable projects on the needles even if I'm working on a sweater at home. But right now it's not looking very likely.
Happy New Year and happy crafting in 2011!
Sunday, December 26, 2010
Decision Time
So Thursday when I realized that my socks-in-progress were an annoying commute away, I had to decide what to cast on next. I'd recently seen a photo of French Press Knit's Breckenridge Cowl, and thought it was a nifty idea for a small project. But I didn't have the recommended size needle and decided I'd just cast on for something vaguely similar, play around with it, and see what happened. So Christmas Day I finished this:

Even waiting for natural light, this yarn does not photograph well. But I'm rather pleased with the cowl- it's loose enough to tuck your chin into, doesn't bind around the throat, and quite soft. And unlike a scarf, doesn't hang down, get in the way, or fall off.
And so now I'm right back where I was Thursday plus one--94 FOs and I need 6 more before the end of the year to finish the hundred projects challenge. And the tulip scarf isn't going to make the cut, I'm afraid. I've been knitting on it off and on for two days and it's less than half done. I could likely finish it this week...but not along with five other projects. Time to haul out the yarn and cast on something new. Something quick. Something in super-bulky yarn! Excuse me, gotta knit now.

Even waiting for natural light, this yarn does not photograph well. But I'm rather pleased with the cowl- it's loose enough to tuck your chin into, doesn't bind around the throat, and quite soft. And unlike a scarf, doesn't hang down, get in the way, or fall off.
And so now I'm right back where I was Thursday plus one--94 FOs and I need 6 more before the end of the year to finish the hundred projects challenge. And the tulip scarf isn't going to make the cut, I'm afraid. I've been knitting on it off and on for two days and it's less than half done. I could likely finish it this week...but not along with five other projects. Time to haul out the yarn and cast on something new. Something quick. Something in super-bulky yarn! Excuse me, gotta knit now.
Thursday, October 28, 2010
100 Projects or Bust
So, after reading Toni's latest post, wherein she does the unforgiving math on just how many knitting days there are left in the year, and further points out that some of those days are holidays, which tend to take up a lot of time that can't be devoted to craft projects, I stared in the mirror and asked, 'why did I sign on for this again?'. And, because I'm silly that way, I answered myself.
Me: Why did I sign on for this 100 projects-in-a-year challenge?
Robin: You thought it would be fun.
Me, weakly: Really?
Robin: Sure. And besides, last year you only made what, around 35 FOs? This year, you're already over 70. If you stopped right now, you'd be twice as productive as last year. Doesn't that mean anything?
Me: It would mean I'm a loser. The challenge was 100 projects.
Robin: You made ten FOs in January, and you have over two months left. It's still doable.
Me: But six of them were fingerless mitts. And some of those were for children! And my first FO, the sweater, was three-quarters done!
Robin: Picky. There's nothing to stop you from knitting 27 pairs of fingerless mitts for the win.
Me: That would be dumb.
Robin: Your mother is already over a hundred projects for the year. And her list included 24 quilts!
Me: She's retired! Besides, I have a bunch of stuff I want to knit that I have materials for.
Robin: Then why are you talking to me? Knit, already.
Don't you just hate it when you argue with yourself and lose?
So, I took inventory of my planned projects. While I'm not abandoning any of them, it's clear that I'm going to have to work in some more mitten and smaller projects if this is going to work. So with that in mind, I stopped by Joann's the other night and got some more mitten yarn. A lot of the miscellaneous worsted I'm given tends to be light colors, which is not ideal for mittens (hence the attack of pink and yellow hats you've been seeing on the blog). Anyway I picked up a couple of darker (and not incidently more colorful) yarn to liven up the mitten knitting experience. Hence:

Note: the color on these is not true. These are so bright I think the camera sensor was dazzled.
Yet more mittens. I may wind up knitting until the giant apple falls on New York, but at least I'll go down fighting crafting!
Me: Why did I sign on for this 100 projects-in-a-year challenge?
Robin: You thought it would be fun.
Me, weakly: Really?
Robin: Sure. And besides, last year you only made what, around 35 FOs? This year, you're already over 70. If you stopped right now, you'd be twice as productive as last year. Doesn't that mean anything?
Me: It would mean I'm a loser. The challenge was 100 projects.
Robin: You made ten FOs in January, and you have over two months left. It's still doable.
Me: But six of them were fingerless mitts. And some of those were for children! And my first FO, the sweater, was three-quarters done!
Robin: Picky. There's nothing to stop you from knitting 27 pairs of fingerless mitts for the win.
Me: That would be dumb.
Robin: Your mother is already over a hundred projects for the year. And her list included 24 quilts!
Me: She's retired! Besides, I have a bunch of stuff I want to knit that I have materials for.
Robin: Then why are you talking to me? Knit, already.
Don't you just hate it when you argue with yourself and lose?
So, I took inventory of my planned projects. While I'm not abandoning any of them, it's clear that I'm going to have to work in some more mitten and smaller projects if this is going to work. So with that in mind, I stopped by Joann's the other night and got some more mitten yarn. A lot of the miscellaneous worsted I'm given tends to be light colors, which is not ideal for mittens (hence the attack of pink and yellow hats you've been seeing on the blog). Anyway I picked up a couple of darker (and not incidently more colorful) yarn to liven up the mitten knitting experience. Hence:

Note: the color on these is not true. These are so bright I think the camera sensor was dazzled.
Yet more mittens. I may wind up knitting until the giant apple falls on New York, but at least I'll go down fighting crafting!
Sunday, August 8, 2010
An FO a Day
So, after finishing the fingerless mitts on Monday, I was struck by inspiration. After all, mittens Sunday, mitts Monday. Suppose I could finish an item each day? That would get me back on track for the 100 projects challenge in just a couple of weeks.
Then I sat myself down and gave myself a talking-to. "Robin," I said, "That's nuts. Crazycakes. Off the deep end. If you aren't a fruit loop just for thinking of this, you certainly would be if you actually tried to do it. Why, this is the kind of idea that Toni would come up with!" (As the originator of the 100 projects challenge, I use her as sort of a measuring standard for insane crafting behavior.)
But the idea just wouldn't leave me, and as the week wore on...well, see for yourself:
Monday: Mitts in the last post.
Tuesday: I finished a crocheted beret.

This was based on a pattern I made a few years back, which I've long since lost, and it was for bulkie yarn anyway, not the worsted I used here. Call it 'inspired by'.
Wednesday: Wednesday was the day I figured I wouldn't have an FO, because I go straight from work to my karate workout. And karate is just not an activity you can combine with knitting. "Knit one, yarn over, ki-yah!"...no, I really don't see how it could work. But I was knitting very small mittens (4-year-old size) so I finished anyway (after I got home, I hasten to add).

Thursday: The yellow beret had been so much fun...and used up a color I was getting a little tired of...so I had immediately started one in pink, which I finished crocheting on Thursday (sewing and weaving in ends weren't completed until the next day, but I'm counting it for Thursday anyway).

Friday: I picked up a hat that had been in time out all week, ripped back to the cable band, changed needle sizes and picked a simple pattern for the body of the hat. This enabled me to achieve something that looked more like a winter hat and less like a hat for a road cone. If road cones wore pink acrylic.

I had actually spotted this construction in another pattern and found it intriguing- you knit the band as a long strip, Kitchener it together, and then pick up stitches for the body. I immediately thought of trying this with circumferential cables. There were a few hiccups...I should have used a provisional cast on instead of doing a two-way cast-on (Judy's magic cast on in this case). The reason is, Judy's magic cast on leaves you with a row of knit loops on the stitch holder, so I had to go back and change them to the appropriate pattern stitches for the cable. And because the two-way cast on alternates, I have a half-stitch jog in the pattern that I couldn't eliminate (at least not without ripping a row in the wrong direction, which is really annoying). I decided I could live with a not-quite-invisible seam in the pattern. And last but not least, it only took me three tries to convince myself that no, I really did have to go up a needle size to get a compatible gauge. Why I resisted this knowledge, I'm not entirely sure. I think I expected that picking up a stitch for every two rows ought to give me the right gauge...but now that I consider it, that's probably only true for garter stitch, which has a different row gauge than stockinette in the same yarn on the same needles.
Saturday: By Saturday, I was starting to run out of steam. Also, I was busy posting a bunch of junk from the basement on freecycle and getting rid of it (I've only been planning to do this for a couple of years). Someday this will lead to the basement actually being cleaned up and reorganized. But in between booting computers, writing posts, uploading photos, and boxing up odds and ends for incoming freecyclers, I turned some odds and ends of skeins into another pair of mittens.

Sunday: So, by Saturday night, I realized that I really had done it--Sunday to Saturday, I'd finished an FO a day. But in the grip of insane ambition, I took my knitting down to the park Sunday for the local knitting group get-together, and made inroads on another mitten. I wove in the ends on its mate a few minutes ago.

You see, that brings me up to 58 FOs, the goal for July. With three full weeks left in August, I now have a reasonable shot at making the August goal.
But really, I'm not insane at all. At least not so long as I don't try to do it again this week.
Then I sat myself down and gave myself a talking-to. "Robin," I said, "That's nuts. Crazycakes. Off the deep end. If you aren't a fruit loop just for thinking of this, you certainly would be if you actually tried to do it. Why, this is the kind of idea that Toni would come up with!" (As the originator of the 100 projects challenge, I use her as sort of a measuring standard for insane crafting behavior.)
But the idea just wouldn't leave me, and as the week wore on...well, see for yourself:
Monday: Mitts in the last post.
Tuesday: I finished a crocheted beret.

This was based on a pattern I made a few years back, which I've long since lost, and it was for bulkie yarn anyway, not the worsted I used here. Call it 'inspired by'.
Wednesday: Wednesday was the day I figured I wouldn't have an FO, because I go straight from work to my karate workout. And karate is just not an activity you can combine with knitting. "Knit one, yarn over, ki-yah!"...no, I really don't see how it could work. But I was knitting very small mittens (4-year-old size) so I finished anyway (after I got home, I hasten to add).

Thursday: The yellow beret had been so much fun...and used up a color I was getting a little tired of...so I had immediately started one in pink, which I finished crocheting on Thursday (sewing and weaving in ends weren't completed until the next day, but I'm counting it for Thursday anyway).

Friday: I picked up a hat that had been in time out all week, ripped back to the cable band, changed needle sizes and picked a simple pattern for the body of the hat. This enabled me to achieve something that looked more like a winter hat and less like a hat for a road cone. If road cones wore pink acrylic.

I had actually spotted this construction in another pattern and found it intriguing- you knit the band as a long strip, Kitchener it together, and then pick up stitches for the body. I immediately thought of trying this with circumferential cables. There were a few hiccups...I should have used a provisional cast on instead of doing a two-way cast-on (Judy's magic cast on in this case). The reason is, Judy's magic cast on leaves you with a row of knit loops on the stitch holder, so I had to go back and change them to the appropriate pattern stitches for the cable. And because the two-way cast on alternates, I have a half-stitch jog in the pattern that I couldn't eliminate (at least not without ripping a row in the wrong direction, which is really annoying). I decided I could live with a not-quite-invisible seam in the pattern. And last but not least, it only took me three tries to convince myself that no, I really did have to go up a needle size to get a compatible gauge. Why I resisted this knowledge, I'm not entirely sure. I think I expected that picking up a stitch for every two rows ought to give me the right gauge...but now that I consider it, that's probably only true for garter stitch, which has a different row gauge than stockinette in the same yarn on the same needles.
Saturday: By Saturday, I was starting to run out of steam. Also, I was busy posting a bunch of junk from the basement on freecycle and getting rid of it (I've only been planning to do this for a couple of years). Someday this will lead to the basement actually being cleaned up and reorganized. But in between booting computers, writing posts, uploading photos, and boxing up odds and ends for incoming freecyclers, I turned some odds and ends of skeins into another pair of mittens.

Sunday: So, by Saturday night, I realized that I really had done it--Sunday to Saturday, I'd finished an FO a day. But in the grip of insane ambition, I took my knitting down to the park Sunday for the local knitting group get-together, and made inroads on another mitten. I wove in the ends on its mate a few minutes ago.

You see, that brings me up to 58 FOs, the goal for July. With three full weeks left in August, I now have a reasonable shot at making the August goal.
But really, I'm not insane at all. At least not so long as I don't try to do it again this week.
Sunday, August 1, 2010
Halfway Late and A Dollar Short
It has been a really lovely weekend up here in the top right corner of the country. Cooler and less steamy than most of the summer so far. Also I took Friday off and went to a quilt show with my mom and a friend of hers. Wow, there was some really gorgeous stuff there! And some mind-blowingly creative and original works. The quilt that did an entire village scene with little pleated clapboard houses still fills me with wonder...both at the workmanship and the insanity of it all. I got home feeling the urge to start a quilt right away, but I sat down quietly and read a book until the urge passed. Not that I wouldn't like to do another quilt, it's just that I have other plans right now.
Speaking of which, the alert amongst you may have noted that I have fallen seriously behind on the 100 projects challenge. To be on schedule, I should have had 50 projects at the end of June, and I only had 44. As of the end of July, I needed 58. Well, I may be down but I'm definitely not out of the running yet! I've been knitting as fast as my little fingers will move, and doing my best to make up ground. Exhibit A:

A cabled hat. I have to say that gray yarn looks a lot better cabled than it does in plain stockinette. Exhibit B:

Children's mittens. Kind of a cheap trick, but they're fast, and indisputably legitimate FOs.
And last but not least, a plain ribbed hat:

--because I have a lot of kind of 'girly' hats for the charity bag at the moment and not so many 'guy' hats. Also, I'd been wanting to use the 'Lorne's Hat' pattern from the Yarn Harlot blog, because I wanted to see what Stephanie's scheme of decreases looked like. (Answer- nice but not all that much different from what I'd been doing.)
So, not there yet, but August will be the month of making up ground. I'm not giving up without a fight!
Speaking of which, the alert amongst you may have noted that I have fallen seriously behind on the 100 projects challenge. To be on schedule, I should have had 50 projects at the end of June, and I only had 44. As of the end of July, I needed 58. Well, I may be down but I'm definitely not out of the running yet! I've been knitting as fast as my little fingers will move, and doing my best to make up ground. Exhibit A:

A cabled hat. I have to say that gray yarn looks a lot better cabled than it does in plain stockinette. Exhibit B:

Children's mittens. Kind of a cheap trick, but they're fast, and indisputably legitimate FOs.
And last but not least, a plain ribbed hat:

--because I have a lot of kind of 'girly' hats for the charity bag at the moment and not so many 'guy' hats. Also, I'd been wanting to use the 'Lorne's Hat' pattern from the Yarn Harlot blog, because I wanted to see what Stephanie's scheme of decreases looked like. (Answer- nice but not all that much different from what I'd been doing.)
So, not there yet, but August will be the month of making up ground. I'm not giving up without a fight!
Monday, May 10, 2010
Making Progress Sideways
As Toni noted in the comments to the last post, I've made good progress toward the May goal (I need 42 FOs year-to-date by the end of the month, currently I'm at 38). In fact, if I kept knitting mittens, no doubt I could have been ahead of schedule. ....that's okay. I can wait while you stop laughing.
Friday evening, my husband and I decided on impulse to go out and listen to music (a very talented young fingerstyle guitarist named Craig D'Andrea) at our local acoustic music venue instead of, say, getting organized for the weekend. So we got home latish, did the bare minimum of house stuff, and crashed. My backup plan had been to be up early and get organized in the morning. I awoke to pouring rain. Soothing peaceful pattering on the roof rain. I thought, 'So much for the outdoor portion of my to-do list', dozed off again and wound up sleeping rather later than I had intended. Which is how at the last minute, I wound up with a whole day of running around ahead of me and no time to match up odd bits of yarn into harmonious (or at least non-awful) color combinations for mittens. Instead I grabbed a set of size 0 dpns and a ball of sock yarn- fast, fun, and guaranteed enough knitting to get me through the day without running out.
So, Saturday morning we went to see Iron Man 2 with friends, which was amusing enough, though I liked the first one better. (Its biggest problem was that it tried to do a whole bunch of different subplots and wound up without enough time to develop any of them properly. The acting was good, but good actors can only do so much without a good script. Also, I was reminded that I may have to stop going to movies in theaters as they have gotten so loud it's often quite painful to listen to. And I really don't think I should have to wear earplugs in order to attend a movie.)
From there we headed out to western Massachusetts through an absolute downpour to visit friends. Since our friends are quite accustomed to me always having knitting in my hands, it occasioned no comment whatsoever that I knit socks through pretty much the rest of the day.
We got home quite late, slept late again and then pursued our campaign to get in better shape. The hike of the week was closer to home, since we'd done so much traveling already on the weekend. We went to a state park near Peterborough NH. Our planned route was twelve miles- the first six miles went over two small peaks, Pack Monadnock and North Pack Monadnock (Pack is believed to be an Indian word that meant 'little'- just plain Monadnock is the largest and very much climbed peak in the area- I hiked up there a couple of years ago), and we walked on back roads to loop back to our car.
It was a really great hike. The hill country is still a few weeks behind us in spring, so the forest canopy hasn't really filled out yet. A lot of sun filtered down to the trail, and the leaves were that lovely shade of intense light green you only see in spring. Tender young grasses and lilies of the valley competed with moss to cover little clearings, and ferns are still uncurling their leaves in slow graceful spirals. The trail along the upper slopes was lined with wild blueberry bushes, covered with their small bell-like white blossoms. It was quite windy and somewhat chilly despite the sunshine, but perfect for a brisk hike- too cool for bugs, and kept us (well, me) from overheating on the uphill bits. When we broke out of the trees, we had an outstanding view of the surrounding forest and mountains and it was clear enough to see all the way to the coast. (Yes, of course I forgot the camera. What was your first clue? Though truly, I'm not sure a picture could do it justice.)
Of course it was only the second really hilly walk of the season, and this particular trail has a lot of steep bits with hard scrambles. So, I'm a little stiff today. But the exercise *is* making a difference, I'm happy to say. It was a steeper climb than anything we did last month, and I still needed fewer stops to get my wind back. We made much better time, and despite the distance, I didn't blister at all. So- I feel like I'm getting a bit of my hiking mojo back, even if I'm still not in the kind of shape I used to be in.
Naturally there was no knitting while hiking (though I actually kind of wished I'd had it for the second bit of the hike, coming back on the road). But there was a fair bit of passenging going to and from hiking, so the socks progressed.
It's funny- I can look at a skein of sock yarn, look even at knitted swatches of the yarn. And it really doesn't tell me much. Self-patterning yarn especially. I quite often start knitting and as the pattern emerges, I say, 'well, darn, I don't think I much care for this'...and yet, somehow, as the socks go on, it seduces me into liking it. This for example-- I liked the colors in the skein, but the patterning initially didn't thrill me. And yet I'm liking it more and more as the socks go on:

Plain toe-up socks in Opal 2104.
So. Best laid plans. I still haven't put together a couple of hours with functioning brain cells to sort out sweaters. I have a couple of other project plans that didn't move at all over the weekend. But we still have three weeks left in May, and I only need four more FOs to stay on schedule. I'm not crazy enough to make any predictions, but it at least looks possible!
Friday evening, my husband and I decided on impulse to go out and listen to music (a very talented young fingerstyle guitarist named Craig D'Andrea) at our local acoustic music venue instead of, say, getting organized for the weekend. So we got home latish, did the bare minimum of house stuff, and crashed. My backup plan had been to be up early and get organized in the morning. I awoke to pouring rain. Soothing peaceful pattering on the roof rain. I thought, 'So much for the outdoor portion of my to-do list', dozed off again and wound up sleeping rather later than I had intended. Which is how at the last minute, I wound up with a whole day of running around ahead of me and no time to match up odd bits of yarn into harmonious (or at least non-awful) color combinations for mittens. Instead I grabbed a set of size 0 dpns and a ball of sock yarn- fast, fun, and guaranteed enough knitting to get me through the day without running out.
So, Saturday morning we went to see Iron Man 2 with friends, which was amusing enough, though I liked the first one better. (Its biggest problem was that it tried to do a whole bunch of different subplots and wound up without enough time to develop any of them properly. The acting was good, but good actors can only do so much without a good script. Also, I was reminded that I may have to stop going to movies in theaters as they have gotten so loud it's often quite painful to listen to. And I really don't think I should have to wear earplugs in order to attend a movie.)
From there we headed out to western Massachusetts through an absolute downpour to visit friends. Since our friends are quite accustomed to me always having knitting in my hands, it occasioned no comment whatsoever that I knit socks through pretty much the rest of the day.
We got home quite late, slept late again and then pursued our campaign to get in better shape. The hike of the week was closer to home, since we'd done so much traveling already on the weekend. We went to a state park near Peterborough NH. Our planned route was twelve miles- the first six miles went over two small peaks, Pack Monadnock and North Pack Monadnock (Pack is believed to be an Indian word that meant 'little'- just plain Monadnock is the largest and very much climbed peak in the area- I hiked up there a couple of years ago), and we walked on back roads to loop back to our car.
It was a really great hike. The hill country is still a few weeks behind us in spring, so the forest canopy hasn't really filled out yet. A lot of sun filtered down to the trail, and the leaves were that lovely shade of intense light green you only see in spring. Tender young grasses and lilies of the valley competed with moss to cover little clearings, and ferns are still uncurling their leaves in slow graceful spirals. The trail along the upper slopes was lined with wild blueberry bushes, covered with their small bell-like white blossoms. It was quite windy and somewhat chilly despite the sunshine, but perfect for a brisk hike- too cool for bugs, and kept us (well, me) from overheating on the uphill bits. When we broke out of the trees, we had an outstanding view of the surrounding forest and mountains and it was clear enough to see all the way to the coast. (Yes, of course I forgot the camera. What was your first clue? Though truly, I'm not sure a picture could do it justice.)
Of course it was only the second really hilly walk of the season, and this particular trail has a lot of steep bits with hard scrambles. So, I'm a little stiff today. But the exercise *is* making a difference, I'm happy to say. It was a steeper climb than anything we did last month, and I still needed fewer stops to get my wind back. We made much better time, and despite the distance, I didn't blister at all. So- I feel like I'm getting a bit of my hiking mojo back, even if I'm still not in the kind of shape I used to be in.
Naturally there was no knitting while hiking (though I actually kind of wished I'd had it for the second bit of the hike, coming back on the road). But there was a fair bit of passenging going to and from hiking, so the socks progressed.
It's funny- I can look at a skein of sock yarn, look even at knitted swatches of the yarn. And it really doesn't tell me much. Self-patterning yarn especially. I quite often start knitting and as the pattern emerges, I say, 'well, darn, I don't think I much care for this'...and yet, somehow, as the socks go on, it seduces me into liking it. This for example-- I liked the colors in the skein, but the patterning initially didn't thrill me. And yet I'm liking it more and more as the socks go on:

Plain toe-up socks in Opal 2104.
So. Best laid plans. I still haven't put together a couple of hours with functioning brain cells to sort out sweaters. I have a couple of other project plans that didn't move at all over the weekend. But we still have three weeks left in May, and I only need four more FOs to stay on schedule. I'm not crazy enough to make any predictions, but it at least looks possible!
Sunday, May 2, 2010
Counting Up
Having determined to finish off April by trying to finish up some projects, I went on a bit of binge. First, the hat I finished in New York last weekend (I omitted the ziz-zag and just let the pattern spiral, so instead of the All-Day Beret, this is the Friday AM beret):

Then I suddenly recalled that I'd always wanted to try Stephanie Pearl-McPhee's Unoriginal Hat pattern. However there was a small impediment. The pattern calls for one of the metric sizes of needles that's between 10.5 and 11 in US sizes. Moreover, it wants dpns. And the largest size of dpns I have is 10.5. So I shrugged and cast on with the needles I had. "Let's see what happens," I said. What happened was that I got a child-sized hat. A fairly small child, or at least a child with a small head. And I still had tons of that yellow yarn left - I'd had some left from the afghan last year even before I got more for Easter. So I added one more repeat of the chart to increase the diameter, and started the hat partway through the chart to add some length and got a quite respectably adult-sized hat. Very charming pattern, and speedy too. I'd recommend it highly for that last minute gift knitting. Here are the two hats in question:

But don't imagine it's all been hattitude around here. Nope, I've been changing off with mittens- there's been a fair amount of gallivanting, and the sweater is just too awkward to travel well, so it's been staying home. Here's my collection of traveling mittens:

Yep, four pairs, for ages 4, 8 and 10 (two of those). Mittens travel almost as well as socks, and so I'm taking a short break until I decide what the next socks will be.
Speaking of gallivanting, this week's ten-mile-plus walk was in Stowe, Vermont. They have a lovely bike-and-recreation trail that follows the river, with many pretty views. Such as:
The village is very charming, with the usual touristy types of shops...also a very nice yarn and fabric store- small, but with a good selection, and some really gorgeous quilts. We strolled around the village, had lunch, admired yarn and quilts, walked a bit over 11 miles. Then stopped on our way south to check out Cold Hollow Cider (yum), their cider doughnuts (yum, yum), and took the tour of the Ben and Jerry's factory in Waterbury. A nice tour, with samples at the end. It was only with fantastic self-restraint that I managed to walk past all the ice-cream and leave empty handed. (It helped that I got two of the little sample cups...)
Surprisingly enough, this gets me close to the 100 projects goal- not quite, as I needed 33 projects by the end of April to be on schedule, where I was only at 31. But still- I was more caught up than I expected. We'll just have to see how May goes.

Then I suddenly recalled that I'd always wanted to try Stephanie Pearl-McPhee's Unoriginal Hat pattern. However there was a small impediment. The pattern calls for one of the metric sizes of needles that's between 10.5 and 11 in US sizes. Moreover, it wants dpns. And the largest size of dpns I have is 10.5. So I shrugged and cast on with the needles I had. "Let's see what happens," I said. What happened was that I got a child-sized hat. A fairly small child, or at least a child with a small head. And I still had tons of that yellow yarn left - I'd had some left from the afghan last year even before I got more for Easter. So I added one more repeat of the chart to increase the diameter, and started the hat partway through the chart to add some length and got a quite respectably adult-sized hat. Very charming pattern, and speedy too. I'd recommend it highly for that last minute gift knitting. Here are the two hats in question:

But don't imagine it's all been hattitude around here. Nope, I've been changing off with mittens- there's been a fair amount of gallivanting, and the sweater is just too awkward to travel well, so it's been staying home. Here's my collection of traveling mittens:

Yep, four pairs, for ages 4, 8 and 10 (two of those). Mittens travel almost as well as socks, and so I'm taking a short break until I decide what the next socks will be.
Speaking of gallivanting, this week's ten-mile-plus walk was in Stowe, Vermont. They have a lovely bike-and-recreation trail that follows the river, with many pretty views. Such as:
The village is very charming, with the usual touristy types of shops...also a very nice yarn and fabric store- small, but with a good selection, and some really gorgeous quilts. We strolled around the village, had lunch, admired yarn and quilts, walked a bit over 11 miles. Then stopped on our way south to check out Cold Hollow Cider (yum), their cider doughnuts (yum, yum), and took the tour of the Ben and Jerry's factory in Waterbury. A nice tour, with samples at the end. It was only with fantastic self-restraint that I managed to walk past all the ice-cream and leave empty handed. (It helped that I got two of the little sample cups...)
Surprisingly enough, this gets me close to the 100 projects goal- not quite, as I needed 33 projects by the end of April to be on schedule, where I was only at 31. But still- I was more caught up than I expected. We'll just have to see how May goes.
Wednesday, January 27, 2010
Let the Games Begin
I've been watching the mounting knitting/crafting Olympic hysteria with a certain amount of detachment. I'm not doing the Ravelolympics, the Knitting Olympics or any of the other 'knitting challenge goals while watching the Olympics' things, even though that kind of goal-oriented behavior is usually right up my alley. (NaNoWriMo, I'm looking at you.) No, I'm sitting them out for one very simple reason. I don't have television. This startles people who've visited me, because there's a large television-shaped piece of electronics in my living room, but that's actually the screen for the DVD and VCR players. And every now and then, I will catch a current television show on the computer, usually while I'm on the exercise bike. But watching on the computer isn't sufficiently attractive enough to make me want to watch sports there, even winter sports which I like better than the summer ones. Besides, the cat objects to having my lap occupied by a computer all the time--that's her spot.
But then today, Toni, a past master at ambitious goals (she's gone a year without eating processed foods, is on her third year of knitting and sewing from stash, and is currently trying to do 100 projects in a year) threw down the gauntlet. We're currently neck and neck with nine FOs apiece for 2010 so far. What, you only counted seven?

Mittens, of course.
So, nine FOs. And she's half-a-pair of pyjamas from FO#10. Now. There's a lot of variation in the amount of time that a project takes--I wouldn't be at nine without those six pairs of fingerless mitts. But she's doing a sweater for her Olympic challenge, and I have a bunch of things in progress at the moment myself. And there are always mittens. Not that I'm competitive or anything. I don't know that I'm up for doing a hundred projects in a year (that's one every three and a half days!). But then I'm a little doubtful Toni's going to make that one either. We'll see where we're at come December, won't we? Toni, you're on!
But then today, Toni, a past master at ambitious goals (she's gone a year without eating processed foods, is on her third year of knitting and sewing from stash, and is currently trying to do 100 projects in a year) threw down the gauntlet. We're currently neck and neck with nine FOs apiece for 2010 so far. What, you only counted seven?

Mittens, of course.
So, nine FOs. And she's half-a-pair of pyjamas from FO#10. Now. There's a lot of variation in the amount of time that a project takes--I wouldn't be at nine without those six pairs of fingerless mitts. But she's doing a sweater for her Olympic challenge, and I have a bunch of things in progress at the moment myself. And there are always mittens. Not that I'm competitive or anything. I don't know that I'm up for doing a hundred projects in a year (that's one every three and a half days!). But then I'm a little doubtful Toni's going to make that one either. We'll see where we're at come December, won't we? Toni, you're on!
Subscribe to:
Posts (Atom)